Fire Rated Lintels
We offer three different ranges of pre-stressed concrete lintel products which meet updated Building Regs for the protection of structural elements of concrete. We also provide CPD accredited training to help customers get their specifications right.
More information
Our three ranges comprise: XtraFire™ which is available in sections of 100mm, 140mm and 215mm; Fire-Spec which is available in sections of 140mm, 190mm and 215mm, and Faced Fire which is available in sections of 140mm, 190mm and 215mm wide but with a smooth type C finish. All of our prestressed concrete lintels are available in a range of fire ratings, please refer to individual product pages for specific information.
Applications include:
- A wide range of commercial and domestic buildings
- Our fire rated lintels are suitable for use in any residential and commercial application where lintels are required to protect the structural integrity of the building and enable the safe evacuation of its occupants.
Testing
Naylor XtraFire™ lintels have been independently fire tested by Exova Warrington Fire.
Benefits of fire rated lintels:
- Available in a wide variety of fire ratings and section lengths
- Offer extra fire resistance over standard concrete lintels
- All sections (including XtraFire™) can be cut to length on site, providing a distinct advantage over other methods of manufacture
- Meet the requirements of the Construction Products Regulations in relation to the Declarations of Performance and UKCA marking
- Manufactured, quality controlled and continually assessed to ensure compliance with BS EN ISO 9001:2015
Additional benefits of XtraFire™ lintels:
- Independently fire tested by Exova Warrington Fire testing facility
- Solid concrete 1 part unit - no need for additional coatings
- Cuttable on site
- Smooth ex-steel mould finish
- Durable product for stocking and storage
- Can be used in aggressive environments
- Can be exposed to cyclic wetting/drying
- Cement replacement technology is used which requires less than 20% of the energy and produces less than 10% of the CO2 emissions compared to Portland cement production.
Contact Us
Want to talk to us about our products? Get in touch
Or why not give us a call on +44 (0) 1226 320810
Want to know more about this product? Sales Contacts
Or why not give us a call on +44 (0) 1226 320810
Product variations:
Scroll Left-Right to View Details
Unsure which lintels to use for your next project?
Check out our lintel selector to help you work out which lintel is right for you.
View our lintel selectorDownloads & Resources
Naylor Lintels Brochure
PDF (2.8 MB)
Naylor Concrete Price List August 2022
PDF (494.2 kB)
Xtrafire Lintel XFR6 Declaration of Performance
PDF (167.4 kB)
Xtrafire Lintel XFR9 Declaration of Performance
PDF (168.7 kB)
Ultra Fire 140-6 Declaration of Performance
PDF (168.1 kB)
Ultra-Fire-140-9-Declaration-of-Performance
PDF (169.0 kB)
Ultra-Fire-215-9-Declaration-of-Performance
PDF (167.3 kB)
Fire-Spec R11 – 60 Mins Declaration of Performance
PDF (198.2 kB)
Fire-Spec R11 – 90 Mins Declaration of Performance
PDF (198.3 kB)
Fire-Spec R13 – 120 Mins Declaration of Performance
PDF (197.3 kB)
Fire-Spec R13 – 60 Mins Declaration of Performance
PDF (198.2 kB)
Fire-Spec R13 – 90 Mins Declaration of Performance
PDF (198.2 kB)
Fire-Spec R14 – 60 Mins Declaration of Performance
PDF (199.0 kB)
Fire-Spec R14 – 90 Mins Declaration of Performance
PDF (199.1 kB)
Fire-Spec R14 – 120 Mins Declaration of Performance
PDF (199.2 kB)
Fire-Spec R190 – 60 Mins Declaration of Performance
PDF (198.5 kB)
Fire-Spec R190 – 90 Mins Declaration of Performance
PDF (198.0 kB)
Fire-Spec R190 – 120 Mins Declaration of Performance
PDF (198.8 kB)
Fire-Spec R2 – 60 Mins Declaration of Performance
PDF (198.2 kB)
Fire-Spec R2 – 90 Mins Declaration of Performance
PDF (198.1 kB)
Fire-Spec R2 – 120 Mins Declaration of Performance
PDF (197.7 kB)
Fire-Spec R3 – 60 Mins Declaration of Performance
PDF (195.3 kB)
Fire-Spec R3 – 90 Mins Declaration of Performance
PDF (195.2 kB)
Fire-Spec R7 – 60 Mins Declaration of Performance
PDF (197.0 kB)
Fire-Spec R7 – 90 Mins Declaration of Performance
PDF (197.1 kB)
Fire-Spec R7 – 120 Mins Declaration of Performance
PDF (197.5 kB)
Fire-Spec R8 – 60 Mins Declaration of Performance
PDF (198.0 kB)
Fire-Spec S8 – 90 Mins Declaration of Performance
PDF (197.1 kB)