Naylor have supplied two sizes of prestressed concrete panels to create a 114m long retaining wall structure around the children’s play area at Cannon Hall Farm. The panels replaced the original timber sleepers which were rotting away, and were the first panels to be supplied as part of an ongoing replacement programme on the farm.
Rob Hampshire, Cannon Hall Farm’s Maintenance Manager, contacted Naylor to arrange a design consultation and site visit in order to determine exact requirements. Product was supplied from December 2022 through to February 2023.